- Works value £100,000
- Ground stabilisation following local de-forestation, to avoid possible land slippage
- Re-grade the moorland face and support the gradient with gabion baskets, backfill with local granite stone
- All works carried out by HFN team of specialist hardworks operators using 15 tonne 360° HFN excavators
Gallery