HFN were appointed as Principle Contractor for this contract.

Project Value £105,000

The contract was split into two number sites, West Mede Shopping Centre and Four Closes Square

West Mede Shopping Centre

  • Site clearance of extensive site furniture, litter bins, concrete bollards, removal of existing hard pavings, concrete slabs, clay bricks and cobbles
  • New paving and edging to comprise macadam and concrete setts were then undertaken
  • Formation of new planting beds including excavation and topsoiling followed
  • Shrub and bulb planting
  • Installation of new litter bins and bollards

Four Closes Square

  • Removal of existing tarmac paving
  • New paving comprising concrete slabs, coloured macadam and resin bonded gravel works were undertaken
  • The installation of proprietary landscape drain system was then constructed to match existing concrete block paving
  • A planting scheme involving a matrix of trees including installation of metal tree guards, an underground anchor system and irrigation piping was then undertaken

The site works were completed within a timed programme and within the client’s budget.